Lancashire Triangle Electrification - Printable Version +- Forum | Merseyside Dennis Dart Website (http://dartslf.com/forum) +-- Forum: Other Transport (/forumdisplay.php?fid=9) +--- Forum: Railways (/forumdisplay.php?fid=10) +--- Thread: Lancashire Triangle Electrification (/showthread.php?tid=534) |
RE: Lancashire Triangle Electrification - childwallblues - 23/08/2013 22:12 (23/08/2013 14:35)507022 Wrote:Wigan Springs Branch/Ince Moss area. Runs between the line from St Helens Central and the West Coast Main Line heading south.(21/08/2013 06:08)childwallblues Wrote: Wiring is complete between Ordsall Lane and Parkside Junction except for a small stretch in the Eccles area. RE: Lancashire Triangle Electrification - childwallblues - 28/08/2013 07:37 The Bamfurlong Curve is being upgraded for passenger trains. The plan obviously is to use the curve as part of diversions when the line between Huyton and Newton-le-Willows is not available. RE: Lancashire Triangle Electrification - childwallblues - 07/09/2013 09:36 The line is now energised between Castlefields Junction (Manchester) and Lowton Junction(Newton-le-Willows). Mast bases are in place between Garswood and Bryn. RE: Lancashire Triangle Electrification - Sprinterdriver - 08/09/2013 21:49 (28/08/2013 07:37)childwallblues Wrote: The Bamfurlong Curve is being upgraded for passenger trains. The plan obviously is to use the curve as part of diversions when the line between Huyton and Newton-le-Willows is not available. This has now been done. SD. RE: Lancashire Triangle Electrification - DVG526 - 09/09/2013 13:28 (07/09/2013 09:36)childwallblues Wrote: The line is now energised between Castlefields Junction (Manchester) and Lowton Junction(Newton-le-Willows). There are still a few gaps in the wires over the Moss, not sure how much of it is actually live although the switch on was supposed to be on Aug 4th. RE: Lancashire Triangle Electrification - childwallblues - 09/09/2013 19:12 (09/09/2013 13:28)DVG526 Wrote:Where are the gaps?(07/09/2013 09:36)childwallblues Wrote: The line is now energised between Castlefields Junction (Manchester) and Lowton Junction(Newton-le-Willows). RE: Lancashire Triangle Electrification - DVG526 - 10/09/2013 08:04 (09/09/2013 19:12)childwallblues Wrote:(09/09/2013 13:28)DVG526 Wrote:Where are the gaps?(07/09/2013 09:36)childwallblues Wrote: The line is now energised between Castlefields Junction (Manchester) and Lowton Junction(Newton-le-Willows). Between Astley and Ordsall Lane, all infrastructure in place just a few small gaps where the wires aren't quite fully knitted together. Can't be long though before we see a test train along there? RE: Lancashire Triangle Electrification - Sprinterdriver - 10/09/2013 10:43 There is also a gap from Astley towards Newton le Willows. SD. RE: Lancashire Triangle Electrification - motormayhem - 10/09/2013 12:21 There are masts being put up in prescot as there are some already up with more awaiting to be put up. RE: Lancashire Triangle Electrification - buses7675 - 10/09/2013 12:34 They are already up around Eccleston Park, noticeable from Portico Lane when driving past! |