(09/01/2017 11:57)motormayhem1 Wrote: [ -> ]Both 4831 and 4833 have just left birkenhead depot to go to a liverpool depot , presumably speke.

Ive been told these have gone to green lane instead as VF is going to start being given.
(10/01/2017 18:49)Raawwwrrr! Wrote: [ -> ]Although it was previously numbered 7922, it is now 7910

Much appreciated - Thanks
(11/01/2017 05:43)motormayhem1 Wrote: [ -> ]Ive been told these have gone to green lane instead as VF is going to start being given.

Sorry if this seems obvious to you, but what is VF?
(11/01/2017 09:43)Valandil Wrote: [ -> ]Sorry if this seems obvious to you, but what is VF?

Is it vehicle familiarisation?
(11/01/2017 10:02)Barney Wrote: [ -> ]Is it vehicle familiarisation?

Yeah its short for veichle familiarisation just so drivers can get use to it and shown the controls and have drive of it.
It also allows the vehicles to be put straight into service immediately the phase 1 work has finished at green lane probably , rather than putting them through the VF after the work has finished.
Makes me wonder, what vehicles will be used for phase 3?
Has anybody got any pictures of this elusive bike bus yet?

Still not seen it
I don't have a picture, but I have seen it in service ... it definitely exists! Smile
(11/01/2017 11:21)N271CKB Wrote: [ -> ]Makes me wonder, what vehicles will be used for phase 3?

Isnt only a certain amount of the double deckers required after phase 1 for work at Green Lane.

Phase 2 vehicles are only required for weekends which brings the requirement down a little.

Phase 3 is probably the one where the vehicles may have to be loaned back to Birkenhead , dont forget it should be a little better weather wise then we hope and passengers may even be fractionally higher than now.