New Intermodal contract starting next week from Doncaster Europort to Garston Terminal via Wakefield, Guide Bridge, Stockport, Altrincham and Acton Bridge;
https://www.realtimetrains.co.uk/train/R...1/detailed
(29/01/2021 19:21)ant17612 Wrote: [ -> ]New Intermodal contract starting next week from Doncaster Europort to Garston Terminal via Wakefield, Guide Bridge, Stockport, Altrincham and Acton Bridge;
https://www.realtimetrains.co.uk/train/R...1/detailed

I have now sussed out the rest of the Paths for this looking like drop off / load up at both Garston FLT and Seaforth CT.

So then, the working is as follows from Monday;
11:14 4Z75 Doncaster Europort to Garston FLT
https://www.realtimetrains.co.uk/train/R...1/detailed

19:18 4F71 Garston FLT to Seaforth CT
https://www.realtimetrains.co.uk/train/R...1/detailed

Then from Tuesday;
03:10 4E71 Seaforth CT to Doncaster Europort
https://www.realtimetrains.co.uk/train/H...2/detailed
I understand these trains will not run.
(31/01/2021 19:06)mikestone Wrote: [ -> ]I understand these trains will not run.

A bizarre one to put into the system then.
(01/02/2021 19:19)ant17612 Wrote: [ -> ]A bizarre one to put into the system then.
I noticed with the GBRF Seaforth to East Mids Gateway service that the paths were in about 6 weeks prior to the service starting. Could that be the case here? Paths in place ready but no service starting yet?
There are about 4 paths for the Mossend to Seaforth service that never get used, they’ve been in for at least 15 months
(01/02/2021 20:12)iMarkeh Wrote: [ -> ]I noticed with the GBRF Seaforth to East Mids Gateway service that the paths were in about 6 weeks prior to the service starting. Could that be the case here? Paths in place ready but no service starting yet?

Maybe but these were originally special editions to the Working Timetable so is weird for them to go in but not run.
(02/02/2021 12:45)ant17612 Wrote: [ -> ]Maybe but these were originally special editions to the Working Timetable so is weird for them to go in but not run.
I posted your post into RailForums (I was going to tag for credit but I didn't see your username listed).

Quote from palmersears
Quote:For anybody thinking of braving the cold to see these at any point, they won't run this week. It's purely a planning exercise to see how the various paths look/whether the timings would work for all concerned if/when the service does start up. Watch this space...
(02/02/2021 17:44)iMarkeh Wrote: [ -> ]I posted your post into RailForums (I was going to tag for credit but I didn't see your username listed).

Quote from palmersears

Ah yes I don't post to there only look at it from time to time. This makes sense then, I assume their are plans to use them Network Rail permitting of course. I wonder if it has anything to do with the influx of containers being shipped into Liverpool but I can only assume the Paths via Altrincham would be empty flats as don't think containers would fit in with parts of the gauging on the line.
(03/02/2021 16:48)ant17612 Wrote: [ -> ]Ah yes I don't post to there only look at it from time to time. This makes sense then, I assume their are plans to use them Network Rail permitting of course. I wonder if it has anything to do with the influx of containers being shipped into Liverpool but I can only assume the Paths via Altrincham would be empty flats as don't think containers would fit in with parts of the gauging on the line.
Seems to be the case.

I would presume the service will have something to do with the influx of containers.

Via Altrincham I think must be ok with some containers as the binliner containers go that way. Isn't the loading gauge W8?