Forum | Merseyside Dennis Dart Website

Full Version: Wirral Bus Network Review
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
Pages: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
Poulton Lancelyn and the Holmlands Estate where two that had extra work done to sort out a gap in provision already
Apparently the tenders are for 12 months so any changes can be brought in when the contracts next come up as the same happened in St Helens
Knowsley is next up for review
(20/08/2017 16:11)mr t Wrote: [ -> ]Knowsley is next up for review

Following Kirkby and Liverpool, I wouldn't have thought there would be much more to do with Knowsley given the overlap between these areas.
Some stops already have new times, & routes to be withdrawn up.
New 38/A/B time table now on M/Travel website
(30/08/2017 10:39)E208 WBG Wrote: [ -> ]New 38/A/B time table now on M/Travel website

Been removed off Merseytravel site unsure why
(30/08/2017 14:41)E208 WBG Wrote: [ -> ]Been removed off Merseytravel site unsure why
http://www.merseytravel.gov.uk/travellin...02017).pdf
(30/08/2017 15:32)iMarkeh Wrote: [ -> ]http://www.merseytravel.gov.uk/travellin...02017).pdf

Just returned with 38B now added
The 38B that's on there now differs from the one that was on when it was first added

Also now has a map at the bottom which wasn't there previously
Pages: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
Reference URL's